KINGSBOURNE, WENTWORTH, Pinewood Road, Virginia Water, Surrey GU25 4PA
Project Details
The works at Kingsbourne comprised of the construction of a new 13,000 sq. ft. underground spa as an addition to the existing house on the Wentworth Estate. The project was undertaken in an area with particularly poor ground conditions, with the water table only 2m from the surface.

Key Issues
• Well point dewatering.
• Installation of Secant Piled Retaining Walls.
• Caltite concrete structure.
• Drained cavity construction.
• Link tunnel to the existing house.

Key Information
CLENT:
Hill Spink
ARCHITECT:
Nicholas Burwell Architects
QUANTITY SURVEYOR:
Stockdales
STRUCTURAL ENGINEER:
Gledsdale Assoc
PHASE 1 VALUE:
£3.65m